GovTech

Smart city & IoT infrastructure

Sensors that survive Indian conditions and data that reaches a decision — because a dashboard nobody acts on is an expensive ornament.

What does a smart city IoT deployment involve?

It involves placing sensors across municipal infrastructure — water supply, waste collection, streetlighting, traffic, air quality — and connecting them to a platform that stores the data, presents it, and alerts the people responsible when a threshold is crossed.

Start with the decision, not the sensor

Smart city programmes fail in a recognisable way: sensors installed, a control room built, screens displaying data, and no change in how anything operates. The data was never connected to a decision anyone was accountable for making.

So the first question is which operational decision improves with this data, who makes it, and what threshold triggers action. If nobody can answer, the sensors will produce a dashboard and nothing else. The second question is whether the hardware survives the site — monsoon, heat, dust and power interruption defeat equipment specified for milder conditions.

Process

How we deliver it

1Define the decisionThe action the data triggersand who owns it.2Select hardware for thesiteRated for local conditions,not laboratory conditions.3Pilot in the worstlocationValidate where conditionsare hardest, not easiest.4Build the platformIngestion, storage, alertingand dashboards.5Roll out withmaintenanceStaged deployment with afunded maintenance plan.
Process flow for Smart city & IoT infrastructure
  1. 01

    Define the decision

    The action the data triggers and who owns it.

  2. 02

    Select hardware for the site

    Rated for local conditions, not laboratory conditions.

  3. 03

    Pilot in the worst location

    Validate where conditions are hardest, not easiest.

  4. 04

    Build the platform

    Ingestion, storage, alerting and dashboards.

  5. 05

    Roll out with maintenance

    Staged deployment with a funded maintenance plan.

Deliverables

What you receive

  • Validated hardware and connectivity specification
  • Pilot results from real conditions
  • Ingestion platform with dashboards and threshold alerting
  • Integration with grievance and departmental systems
  • Device management plan with realistic maintenance costing

Engagement shape

Pilot of eight to fourteen weeks, then staged rollout priced per site or device count.

Tooling

What we typically build with

  • LoRaWAN and NB-IoT
  • MQTT
  • TimescaleDB
  • Grafana
  • Node.js
  • GIS integration
  • Solar-powered field units

Stack decisions follow the problem. This is where we usually start, not a fixed menu.

Frequently asked

Questions we get about this

What happens to sensors after the project ends?

They need maintenance, and this is where most smart city deployments quietly fail — batteries die, units are damaged or stolen, firmware ages, and no budget line covers it. We insist on a costed maintenance plan as part of the proposal rather than presenting deployment as a one-time expense.

Do we need a control room?

Rarely at first. Alerts routed to the officers who act on them, on their phones, deliver most of the operational benefit. A control room is a significant capital and staffing commitment worth making only once the alerting is proven to change behaviour.

Talk it through before you commit

A discovery call is a working session on your constraint, not a sales pitch.

Quick inquiry

Tell us what you're trying to build

A short note is enough. You'll hear back from the team, not a bot — usually within one working day.

Captcha challenge